| Year |
Milestones |
Major Projects |
| 1996 |
- Founding of TMG! - Provided U/G paste backfill pipe pressure monitoring system. |
Cannington, Queensland |
| 1997 - 1998 |
- Engaged as a Golder PasteTec subcontractor.
- Led the design, construction, and commissioning of the Tailings Paste Backfill Plant for Inmet's Caraiba mine. |
Mineracao Caraiba, Brazil |
| 1999 - 2000 |
- Still engaged as a Golder PasteTec subcontractor.
- Led the design, construction, and commissioning of the Tailings Paste Backfill Plant for Cayeli. |
Cayeli Bakir Isletmeleri, Turkey |
| 2001 |
- Provided expert witness support for the plaintiff
in a dispute with an automation systems integrator. |
Hostmann-Steinberg, Brampton |
| 2002 - 2003 |
- Provided process design and project management
services for a variety of projects at a chemical plant. |
Hostmann-Steinberg, Brampton |
| 2003 - 2004 |
- Engaged as a subcontractor by GE Multilin for several projects, including:
- Pearson Airport Expansion
- Springfield City grid upgrade |
GE Multilin, Ontario |
| 2004 - 2005 |
- Engaged as a Minefill Services subcontractor.
- Led the design, construction, and commissioning of the underground Cemented Rockfill Plant for Barrick Goldstrike. |
Barrick Goldstrike, Nevada |
| 2005 |
- Managed the process design for the PFS for a cobalt mine backfill plant.
|
Idaho Cobalt, Idaho |
| 2005 |
- Subcontractor to SNC Lavalin.
- Project Manager for several database validation projects, for ELI Lilly, Cangene, and MDS.
|
Eli Lilly, Toronto |
| 2006 |
- Managed the process validation for a Blow,Fill, Seal packing line.
- Designed and implemented an online document handling system for the manufacturing facility.
|
AstraZeneca, Mississauga |
| 2006 |
- Managed the process validation for a pharmaceutical manufacturing line.
|
USDM Life Sciences, Santa Barbara |
| 2007 - 2009 |
- Engaged as a subcontractor for Hatch Engineering.
- Led the design, construction, and commissioning of the Paste Backfill Plant for Xstrata Nickel.
|
Nickel Rim South, Sudbury |
| 2009 - 2010 |
- Appointed to the roles of Commissioning and Construction Manager for the last stages of the project.
|
Nickel Rim South, Sudbury |
| 2010 - 2012 |
- Appointed Project Director for the Quebec Lithium project.
|
Quebec Lithium, Quebec |
| 2013 |
- Developed and managed next generation Lithium
metal processing research project.
|
QLI Metals, Quebec |
| 2014 - 2016 |
- Appointed VP Projects.
- Appointed interim VP and GM for Mt.Milligan Mine.
|
Centerra Gold, Toronto |
| 2016 - 2018 |
- Appointed VP Projects.
|
New Gold, Toronto |
| 2019 |
- Provided due diligence for a food processing facility.
|
'The Marbour Group, Windsor |
| 2020 - Now |
- Co-founded TMG Ltd. - Current CEO
|
Technical Management Groupor Ltd, Toronto |