TMG has provided process design, system and database validation, and comprehensive project management services for almost 30 years.

Most of its clients have been in the mining sector, with some focus on manufacturing and pharmaceutical industries as well.



Year Milestones Major Projects
1996 - Founding of TMG!

- Provided U/G paste backfill pipe pressure monitoring system.

Cannington, Queensland
1997 - 1998 - Engaged as a Golder PasteTec subcontractor.
- Led the design, construction, and commissioning
of the Tailings Paste Backfill Plant
for Inmet's Caraiba mine.

Mineracao Caraiba, Brazil
1999 - 2000 - Still engaged as a Golder PasteTec subcontractor.
- Led the design, construction, and commissioning of the
Tailings Paste Backfill Plant for Cayeli.

Cayeli Bakir Isletmeleri, Turkey
2001 - Provided expert witness support for the plaintiff
in a dispute with an automation systems integrator.

Hostmann-Steinberg, Brampton
2002 - 2003 - Provided process design and project management
services for a variety of projects at a chemical plant.

Hostmann-Steinberg, Brampton
2003 - 2004 - Engaged as a subcontractor by GE Multilin for several projects, including:
    - Pearson Airport Expansion
    - Springfield City grid upgrade

GE Multilin, Ontario
2004 - 2005 - Engaged as a Minefill Services subcontractor.
- Led the design, construction, and commissioning of the underground
Cemented Rockfill Plant for Barrick Goldstrike.

Barrick Goldstrike, Nevada
2005 - Managed the process design for the PFS
for a cobalt mine backfill plant.

Idaho Cobalt, Idaho
2005 - Subcontractor to SNC Lavalin.
- Project Manager for several database validation projects,
for ELI Lilly, Cangene, and MDS.

Eli Lilly, Toronto
2006 - Managed the process validation for a
Blow,Fill, Seal packing line.
- Designed and implemented an online document
handling system for the manufacturing facility.

AstraZeneca, Mississauga
2006 - Managed the process validation for a pharmaceutical
manufacturing line.

USDM Life Sciences, Santa Barbara
2007 - 2009 - Engaged as a subcontractor for Hatch Engineering.
- Led the design, construction, and commissioning of the
Paste Backfill Plant for Xstrata Nickel.

Nickel Rim South, Sudbury
2009 - 2010 - Appointed to the roles of Commissioning and
Construction Manager for the last stages of the project.

Nickel Rim South, Sudbury
2010 - 2012 - Appointed Project Director for the
Quebec Lithium project.

Quebec Lithium, Quebec
2013 - Developed and managed next generation Lithium
metal processing research project.

QLI Metals, Quebec
2014 - 2016 - Appointed VP Projects.
- Appointed interim VP and GM for Mt.Milligan Mine.

Centerra Gold, Toronto
2016 - 2018 - Appointed VP Projects.
New Gold, Toronto
2019 - Provided due diligence for a food processing facility.

'The Marbour Group, Windsor
2020 - Now - Co-founded TMG Ltd.
- Current CEO

Technical Management Groupor Ltd, Toronto